PHASE 5
Pre-Production

• Assemble Final
3-D Data / Drawing Package
• for Quotation
• Performance,
Safety & Reliability Specs
• Available
• Physical Specs Available
• Generate Assembly / Sub-Assembly Drawings
• Finalize Product Color/Graphics
• Generate Assembly Specs
• Create Instruction Sheet
• Design Packaging
• Finalize Bill Of Materials
• Obtain B/O Part Quotes
• Obtain In-House Part Quotes
• Update Design
to Meet Manufacturers Tooling
• and Production Requirements
• Secure Tooling Quotes
• Update Cost Estimate
• Product Review
• Release Production Tooling
• Order B/O Parts
• Initiate Patent Application
• Design Assembly Equipment
• Design Assembly Line
• Design Packaging
• First Sample Parts from Production Tooling
• Dimensional
Inspection

• Test First Samples
• Engineering Pilot Parts
• Revise Part Drawing Files (if necessary)
• Modify Production Tooling (if necessary)
• Second Sample Parts from Production Tooling
• Dimensional Inspection
• Test Second Samples
• Dimensional Inspection Sign-Off
• Final BOM issued
• Part Release Sign-Off
• Construct Assembly Equipment
• Packaging Artwork Complete
• Order Packaging
• Build Pre-Production Samples
• Submit to QA for Testing
• Produce Critical Data Sheets
• Test Pre-Production Samples to Standards
• Field Test Pre-Production Samples
• Life Test Pre-Production Samples
• B/O Parts In-House
• Packaging In-House
• Assembly Equipment In-House
• Set-up Production Line
• Production Tooling to Molders
• Begin Molding
• Begin Pre-Production Assembly Run
• Pre-Production Evaluation
• Confirm Receipt of Agency Approval
• Final QA, Marketing, Manufacturing Sign-Off